Troubleshooting requisitions

Common requisition issues and the checks to make when something is not working as expected

Written by Austin Brummer

I cannot see the requisition

Visibility depends on your role and where the requisition has been routed. Check that all of the following are in place:

  • You have permission to view requisitions for the relevant company, project, or labour desk

  • Your role gives access to the company, project, or supplier scope on the requisition

  • For agency users, the requisition has been sent or released to your agency

  • Filters such as status, date range, company, and project are not hiding it

  • The requisition is not cancelled or rejected and excluded by your current filter


​

I cannot raise a requisition

Raising a requisition requires permission and a valid configuration. If you cannot raise one, check that:

  • A company admin has confirmed your role can create requisitions for the selected project

  • The company and project are active and configured for requisitions

  • Complete the required fields shown by the form. Work activity, cost code, approvers, hiring managers, and custom fields depend on company configuration and the selected approval route


​

I cannot find Approve requisition

Open the requisition detail page and select Actions at the top right, then Approve requisition. The label uses your company's preferred name for requisitions. The approval action is not in the Overview tab or a section further down the page.

If the action is missing, ask your hiring company's administrator to check your approval permissions, project approval value limit, the pending stage and any fixed-user assignment, and the requisition status. Agencies do not complete the hiring company's approval.


​

No approvers are available

The approver list is built from the project approval setup and the current approval stage. If no approvers appear:

  • The project may have no eligible approvers configured for the stage

  • Multi-stage approval may not be configured with users for the relevant stage

  • Approvers may be inactive, unverified, or no longer assigned to the project

  • Ask an administrator to review the project users and approval configuration


​

Agencies are missing

Agency availability is controlled by setup and tiering. Common reasons an agency does not appear:

  • Not connected to the project or company supplier list

  • Restricted by supplier or labour-desk rules

  • Inactive at the agency, company, or project level

  • You do not have permission to amend the supplier list

  • For agency users viewing the list, a later-tier requisition may not have been released yet; this does not prevent the hiring team selecting later-tier agencies


​

Rates or pay types are unavailable

Rates depend on the selected trade, project, and company configuration. If they are missing or restricted, check:

  • The selected trade has rates configured for the project

  • Pay type and rate type combinations are available for that trade

  • Rate override settings are allowed for your role

  • Jurisdiction and company rate configuration cover the requisition

  • Purchase order validation is not blocking the selection


​

I cannot amend the supplier list

Supplier list changes need permission and a compatible requisition state. You may be blocked when:

  • You do not have the requisition.amend.supplier permission

  • Company or project configuration restricts supplier changes

  • The requisition status no longer allows supplier list changes

  • The target agency is inactive, restricted, already attached, or otherwise not eligible


​

A requisition is not marked as filled

Filled status is calculated differently for each fulfilment mode:

  • Standard — counted assignments must meet or exceed the requested quantity; start confirmation is not required

  • Shift-based — every working day in the requisition must have enough assigned coverage

  • Cancelled assignments are excluded from shift-based coverage; Standard Filled calculation can still count them if they have a completed or ended date


​

I cannot submit more workers

For manual assign, the submission dialog allows up to 10 workers per agency response, or the requested quantity if higher. For example, a requisition for 3 workers allows 10 per agency response; one for 15 allows 15. This applies when submitting or amending a response and excludes workers whose assignments have been cancelled.

Agencies should reduce their selected workers to the allowed count. Hirers may see more submissions overall because this is a limit per agency response, not a combined limit across agencies. With auto-assign enabled, standard submissions cannot exceed the quantity still unfilled. Shift-based assignments cannot exceed the requirement for any selected date.


​

A worker cannot be assigned

Assignment can be blocked by permission, status, or eligibility rules. Common reasons include:

  • You do not have the requisition.assign permission

  • The requisition is filled, rejected, or cancelled

  • The agency is restricted or the worker has been rejected

  • The worker is already assigned to the requisition

  • Missing availability, right-to-work, ID checks, or competency requirements

  • Trade or submission criteria rules are not met

  • Standard — you cannot assign more workers than the remaining required quantity

  • Shift-based — the worker must have valid assigned dates and daily coverage cannot exceed the required quantity


​

Purchase order validation is failing

When purchase order validation is enabled, selected agencies must have valid PO coverage for the requisition. If validation fails:

  • Check that an active purchase order exists for each affected agency

  • Confirm the PO scope covers the requisition's project, site, and trade

  • Check that the PO has not expired: the requisition selector checks its end date against today, not the full requisition date range

  • Validation runs when raising, approving, and sending to agencies


​

An agency has not received the requisition yet

Tiered scheduling delays notifications to later-tier agencies:

  • Only Tier 1 agencies and any agencies selected for immediate release are notified straight away

  • Later-tier agencies stay in scheduled status until their trigger time is reached

  • Scheduled agencies do not receive emails or in-app notifications until released

  • An authorised user can use the immediate send action to release an agency early


​

I cannot amend dates, shift, or rates

Different amendments have different blocking conditions:

  • Dates and shift pattern — the Actions menu hides these while any assigned worker has no cancellation date; ending an assignment alone does not unlock them

  • Rates, pay type, and rate type — can be amended from the Value tab until any worker has been assigned. Before all approval stages are complete, including while raising the requisition, Amend Requisition Rates (Before approval) is required. Once fully approved, Amend Requisition Rates (After approval) is required. Agencies see the resulting rates subject to rate access

  • Actions menu amendments have state restrictions; edit controls in the Overview and Value tabs have their own permission and validation checks


​

Shift-based coverage does not look right

Shift-based coverage uses specific rules for working days and worker counts:

  • Coverage is calculated for every date between the start and end dates

  • Only days that fall on the requisition shift pattern count as working days; non-working days are excluded

  • Assigned workers are counted from active assigned candidates only; cancelled assignments are excluded, so coverage may drop when assignments are cancelled

  • Available worker counts come from agency submissions with date availability and exclude workers already assigned

  • Agency users see the assigned and available worker views filtered to that agency, so their figures can differ from the internal totals


​

A timesheet approver cannot be selected

Specific timesheet approver selection has eligibility and limit rules:

  • Only eligible project users appear in the list

  • A user must be active, verified, and hold the project-level Timesheet Approval permission; project-role users must be assigned to the project, while company admins are loaded from the company

  • Up to four timesheet approvers can be selected

  • At least one approver is required when raising or editing the approver list